This Project was rather unique. We demoed 2 side by side bathrooms. The first one we relocated a lot of the plumbing and redesigned the layout. The second bathroom, was a powder room located in the master bedroom. Beside the powder room was a closet. We removed the closet and turned it into a custom shower for the master. We relocated the closet to the other side of the room. After all was said and done, the clients where ecstatic with the work and the fact that they now have a full 3 piece master bathroom.
Tiling, Plumbing, Painting, Electrical, Demolition, Design, Glass Shower
Scarborough
4 Weeks
under $20,000
See More Past Projects
Bathroom Renovation
Aurora Bathroom Remodel with Heated Flooring
Basement Renovation
Partial Basement Renovation In Holland Landing
Basement Renovation
Basement Built For Entertainment In Aurora
Basement Renovation