How Long Does A Basement Renovation Take To Finish?

Aurora Basement Renovation Custom Washroom

The duration of a basement renovation in Ontario can vary depending on several factors, such as the size of the basement, the scope of the project, and the complexity of the design. However, here is a general timeline breakdown:

  1. Permits and Planning (1–4 weeks):
    • If permits are required, especially for significant structural changes, plumbing, or electrical work, the process could take time depending on your municipality’s approval process.
    • Design and material selection can also influence this stage.
  2. Framing and Structural Work (2-5 Days):
    • Framing the walls and any necessary structural modifications are typically the first physical steps.
  3. Electrical, Plumbing, and HVAC Rough-ins (5-8 Days):
    • Roughing in the electrical wiring, plumbing, and HVAC can take time depending on the complexity of the project.
    • If any Major HVAC changes need to happen Like Relocating the Boiler or furnace or Redirecting Duct work, this could extend the process
  4. Insulation and Drywall (2-5 Days):
    • After rough-ins, insulation is installed, followed by drywall. Drywall installation and finishing (mud and tape) might take longer due to the drying times between coats.
  5. Flooring (1–5 Days):
    • Flooring installation such as Vinyl or laminate would take 1-2 days, depending on if you’re doing a subfloor or not
    • Tile installation in the washrooms takes longer usually (2-5 days) depending on the size of the washroom and the complexity of the tile design
  6. Finishes (Paint, Trim, and Fixtures) (2-5 Days):
    • Painting, trim work, and the installation of fixtures like light switches, baseboards, and plumbing fixtures follow.
  7. Final Touches and Inspections (3–6 Days):
    • The final steps involve installing any remaining elements, such as cabinetry or entertainment systems, followed by a final inspection if required.

Overall Timeline:

  • For a standard basement renovation in Ontario, the project typically takes 3 to 6 weeks. Larger or more custom projects May take longer. Also things like Creating new walk Up entrances that involve digging and installing new windows may also increase the timeframe of the work to complete the basement

Weather, contractor availability, and material delays can also impact the timeline

To discuss your basement renovation plans and discover how we can help bring your vision to life with the best finishing materials for your space and how long the basement of your choice will take to finish then feel free Contact Yorkland Homes today

Check out more posts below...

basement renovation flooring materials

Popular Basement Finishing Materials and Their Benefits

damp window of a basement apartment

Managing Humidity and Air Quality in Basements

young couple complaining about the noise in their basement apartment

Advanced Soundproofing Techniques for Basements

basement renovation insulation

The Importance of Insulation in Basement Renovations

basement laundry room renovation toronto

Designing a Functional Basement Laundry Room

couple looking at progress of home renovation

Living Through a Renovation: Tips for Comfort

building permit

The Role of Permits in Home Renovations

choosing the right color grout

Your Guide to Choosing the Right Grout for Your Tiling Project

Ready to

Complete the form below to request a FREE quote!